Table & Shoring Scaffolding System

High load capacity and short cycle times for concrete slabs.

  • 25 components
  • 72 size options
  • 150 × 120-200 cm Frame
  • Ø60 × 3-4 mm Tube
SSS

About the Table & Shoring Scaffolding System

BLC Table & Shoring Scaffolding is a temporary support system that safely carries the formwork while pouring concrete slabs and beams. High-capacity frames with adjustable base and head jacks adapt quickly to different storey heights, and together with H20 timber beams form a flat and safe formwork surface. Fast assembly and dismantling save time and cost on site.

Key features

  • Ø60 mm frames with 3 mm / 4 mm wall thickness
  • Precise level adjustment with base & head jacks
  • Four-way head compatible with H20 timber beams
  • Fast cycles with table carrier and lifting fork
  • Modular frame sizes: 150×120 / 150 / 180 / 200
  • Painted or galvanized finish options
Table & Shoring Scaffolding System Table & Shoring Scaffolding System - 2Table & Shoring Scaffolding System - 3
Table & Shoring Scaffolding System

Erection sequence

Table & Shoring Scaffolding System - General view

General view

  1. Base Jack Ø48
  2. Shoring Frame
  3. Diagonal
  4. Scaffold Connection Ø60
  5. H20 Head Jack
  6. Main Beam - H20
  7. Secondary Beam - H20
  8. Plywood
  1. Position and height of the base jacks are set according to the shoring plan.
  2. The first level frames are mounted on the base jacks.
  3. Diagonals are fitted and the first level is completed.
  4. Connection spigots are inserted into the frames.
  5. Second level frames are placed and fixed to the first level with pins and split pins.
  6. Diagonals of the second level are fitted.
  7. The steps are repeated up to the design height.
  8. The height of the H20 head jacks is adjusted according to the design.
  9. Main H20 beams are placed according to their length and overlaps, followed by the secondary beams.
  10. The system is completed by laying the plywood.

Application notes

  • Frame and jack loads must be checked by calculation according to slab thickness.
  • Jacks must not be extended beyond the design length.
  • Erection, dismantling and modifications must only be carried out by trained, certified crews according to the approved design.
  • Damaged, deformed or incomplete components must never be used.
  • The ground must be level, firm and capable of carrying the loads.
  • The system must be inspected by a competent person after erection, at regular intervals, after any modification and after adverse weather.
  • Local regulations and occupational health & safety rules must be followed.
Catalogues

Table & Shoring Scaffolding System catalogue

System introduction, size and weight tables of all components, erection sequence and technical data in a single PDF. Turkish / English.

Download catalogue (PDF) · 4.3 MB All catalogues
On site

Slab and shoring applications · Table scaffolds, shoring and props

Slab and shoring applicationsSlab and shoring applicationsSlab and shoring applicationsSlab and shoring applications
FAQ

Frequently asked questions

What is the difference between table and shoring scaffolds?

Both use the same frames; table scaffolds are moved to the next slab by crane or carrier without dismantling, saving time and labour.

Which frame sizes are available?

150 cm wide frames in 120 - 150 - 180 - 200 cm heights; Ø60 mm tube with 3 mm or 4 mm wall.