SAFETY SYSTEMS & ACCESSORIES
Safety Net Console
Net system against falls and falling material between floors.
- 10 components
- 20 size options
SNC
About the Safety Net Console
BLC Safety Net Console consists of main rails fixed to the building facade, tension tubes and safety nets. During construction it protects workers between floors and passers-by against falls and falling material.
Key features
- 450 / 600 cm main rails
- 6 mm safety net and 2 mm debris net
- Fast connection with carabines and rope
Safety Net Console
System components
Click a component for its size and weight table.

Safety Net Main Rail
450–600 cm · 42–52 kg
Tension Tube Ø60×3.0
600 cm · 25.5 kg
Safety Net 6 mm 100×100
400×200 … 400×600 · 4–12 kg
Debris Net 2 mm 20×20
400×200 … 400×600 · 2–6 kg
Perforated Tube Ø60×3.0
200–600 cm · 7.8–23.4 kg
Rope
800 cm · 0.4 kg
Carabine
10 mm · 0.15 kg
U Coupler
12 mm · 0.3 kg
Plastic Cable Tie 3.6
25 cm · 0.1 kg
Bolt and Nut 16×100
16×100 · 0.2 kg
Safety Net Console
Erection sequence
General view
- Main Rail
- Tension Tube Ø60×3.0
- Carabiner
- U Coupler
- Plastic Coupler
- Perforated Tube Ø60×3.0
- Safety Net 6 mm 100×100
- Debris Net 2 mm 20×20
- Tension tubes are connected to the main rails.
- The safety net (6 mm, 100×100) is fitted to the tubes.
- The net is fastened to the perforated tubes with carabiners.
- Tubes are connected to the main rails and tension tubes with U bolts.
- The debris net (2 mm, 20×20) is fixed on the safety net with plastic couplers.
- The assembled console is lifted by crane to its floor.
- The console is fixed to the slab with anchor screws.
- The system is opened and is ready for use.
Application notes
- TS EN 1263-2: maximum fall height is 6 m on surfaces inclined less than 20°.
- Maximum fall height is 3 m on surfaces inclined more than 20°.
- Nets should be installed as close as possible to the work area.
- Erection, dismantling and modifications must only be carried out by trained, certified crews according to the approved design.
- Damaged, deformed or incomplete components must never be used.
- The ground must be level, firm and capable of carrying the loads.
- The system must be inspected by a competent person after erection, at regular intervals, after any modification and after adverse weather.
- Local regulations and occupational health & safety rules must be followed.
Catalogues
Safety Net Console catalogue
System introduction, size and weight tables of all components, erection sequence and technical data in a single PDF. Turkish / English.
Download catalogue (PDF) · 4.3 MB All catalogues
SAFETY SYSTEMS & ACCESSORIES